How we size systems in southern New Hampshire
Manual J load calculations, run against the design conditions that actually apply here : not a tonnage guess off the square footage.
Design temperatures are shared across both Rockingham and Hillsborough counties, so one correctly-built calculation method applies to every town we serve.
Why rule-of-thumb sizing fails in this climate
The most common sizing method in residential HVAC is still square footage divided by a number someone learned twenty years ago. In a 0°F design climate that produces systems that are dramatically oversized for the 95% of the winter that is not the coldest hour of the year, and badly oversized for summer, when southern New Hampshire's real problem is humidity, not raw heat.
An oversized furnace or air conditioner satisfies the thermostat fast and shuts off. That short-cycling means the equipment never reaches steady-state efficiency, the air conditioner never runs long enough to pull moisture out of the air, rooms far from the air handler never get their share of airflow, and the compressor or ignitor racks up wear cycles that shorten its life. Bigger is not safer; it is just more expensive twice.
Manual J: the load calculation
ACCA Manual J is the industry-standard method for calculating how much heat a house loses and gains. Done properly it is room by room, and it accounts for orientation, window area and type, insulation levels, infiltration, ceiling heights, and internal gains. The output is a heating load and a cooling load in BTU per hour for the whole house and for each individual room.
The room-by-room part matters more than most homeowners realise. Whole-house numbers tell you what equipment to buy; room-by-room numbers tell you how much air each room needs, which is the only way to fix the bedroom that has been ten degrees off since the house was built.
Manual S: choosing the equipment
Nominal tonnage on a box is a marketing number. Manual S takes the Manual J load and matches it against a specific unit's published expanded performance data at your design conditions. That distinction matters enormously for heat pumps in this climate: a heat pump rated at three tons at 47°F may deliver considerably less at 5°F, and cold-climate models hold capacity far better than standard ones. Selecting on nameplate tonnage alone is how homeowners end up with a heat pump that runs out of capacity exactly when they need it.
Manual D: the duct system
Correctly sized equipment on undersized ducts still performs badly. Manual D sizes trunk and branch ductwork to deliver each room's calculated airflow without excessive static pressure or noise. In older housing stock across Manchester, Nashua and the Rockingham towns we regularly measure static pressure at double the manufacturer's maximum: an equipment problem that no new equipment will solve.
What you should receive
- Room-by-room heating and cooling loads, not a single whole-house figure
- The design temperatures used: 0°F heating and 90°F cooling for southern NH
- The assumptions used for insulation, windows and infiltration
- The specific equipment model selected and its performance at those conditions
- A duct design or, on a replacement, measured static pressure and airflow
If a contractor cannot produce those, they did not size your system: they guessed at it. Ask to see the report before you sign anything.
Where this shows up in the work
Sizing drives everything else on this site: whether a cold-climate heat pump can carry your house, whether the oil-versus-heat-pump math works out, what NHSaves rebates your equipment qualifies for, and whether a new build gets a system that matches the house.
Every Service One installation quote is built on a load calculation. If you want the numbers before you commit to anything, we will walk you through them.
Frequently asked
Both Rockingham and Hillsborough counties use a 0°F heating design temperature and a 90°F cooling design temperature. Those are the outdoor conditions a Manual J load calculation should be run against for homes in our service area.
New Hampshire is IECC Climate Zone 6A: cold and humid. That drives insulation assumptions, equipment selection and the need for cold-climate rated heat pumps rather than standard-efficiency units.
Square footage rules of thumb routinely oversize equipment by 30–50%. Oversized systems short-cycle, fail to dehumidify in summer, and wear out sooner. A room-by-room Manual J is the only way to size correctly, and it is what the codes and manufacturers reference.
Manual J calculates the heating and cooling load room by room. Manual S selects specific equipment whose published performance meets that load at your design temperatures. Manual D sizes the duct system to actually deliver the calculated airflow to each room.
Both. A replacement is the best opportunity to correct a system that was mis-sized the first time, especially if the home has since been insulated, had windows replaced, or added conditioned space.
Want your home's actual load calculated?
Free in-home estimate with a room-by-room load calculation and a written installed price.
