Manual J load calculations, Manual D duct design, and Manual S equipment selection: done properly from plan review through commissioning, coordinated with your builder's schedule.

Why rule-of-thumb sizing fails

"500 square feet per ton" and similar rules of thumb ignore almost everything that actually determines a home's heating and cooling load: how the house is oriented to the sun, how much glass is on the south and west walls, how tight the building envelope is, how much infiltration the framing and air sealing allow, and what temperature extreme the system has to handle on the coldest and hottest days of the year. Two houses with identical square footage can have load calculations that differ by 30% or more once those factors are accounted for.

A Manual J load calculation, the ACCA industry standard, replaces the guess with room-by-room math using the home's actual construction: orientation, window area and glazing performance, wall and ceiling R-values, air infiltration rate, and the local winter and summer design temperatures. For southern New Hampshire, that design temperature is roughly 0°F in winter under IECC Climate Zone 6A, which sets the baseline insulation and air-sealing requirements the home is built to in the first place.

Manual D duct design

Right-sized equipment connected to poorly designed ductwork still underperforms. Manual D calculates the static pressure budget for the system and sizes trunk and branch ducts so the blower can actually push the designed airflow to every room, not just the rooms closest to the air handler.

Undersized return-air ducts are one of the most common problems we see in the field, whether in new construction or existing homes. A starved return raises static pressure, forces the blower to work harder, drives up energy use and noise, and undermines the performance the equipment was designed to deliver: regardless of how correctly it was sized on paper.

Manual S equipment selection

Once the Manual J load is known, Manual S guides equipment selection so the furnace, air conditioner, heat pump, or boiler is matched to that specific load: not rounded up "to be safe." Oversized equipment short-cycles, wears out faster, and does a worse job of controlling humidity than a correctly sized system running longer, steadier cycles.

Working with builders

New construction mechanical work only goes smoothly when it's coordinated with the framing, rough, and trim schedule, and with the other trades on site. We attend rough-in walkthroughs, work directly with electricians on equipment disconnects and low-voltage wiring, coordinate with plumbers on condensate lines and gas piping, and work punch lists with the builder's superintendent through closeout.

Multi-zone layouts for open-plan and two-story homes

Open-concept first floors and two-story layouts rarely have a uniform load across the whole house: a great room with south-facing glass and a vaulted ceiling behaves nothing like an upstairs bedroom over an unfinished garage. We use the room-by-room Manual J results to design zoning, whether that's a single system with ducted zone dampers or separate systems for separate levels, so each area is actually controlled to its own load instead of averaging comfort across a single thermostat.

Code compliance

  • Compliance with New Hampshire's adopted residential energy code, based on IECC Climate Zone 6A requirements
  • Duct sealing to reduce leakage: an increasingly common item verified by duct-leakage or blower-door testing on new builds
  • Combustion air supply sized correctly for fuel-burning furnaces and boilers
  • Mechanical ventilation sized to the home's tightness, since a well-sealed envelope needs planned fresh-air exchange rather than relying on incidental leakage

From plan review to commissioning

  1. 1

    Plan review

    We review the architectural plans early, ideally before framing, to identify mechanical closet locations, duct chase paths, and equipment placement while they're still cheap to change.

  2. 2

    Manual J load calculation

    We calculate the home's actual heating and cooling load room by room, using the home's orientation, envelope construction, window area and glazing, infiltration rate, and the southern NH winter design temperature (roughly 0°F) under IECC Climate Zone 6A.

  3. 3

    Manual S equipment selection

    With the load calculated, we select equipment (furnace, air conditioner, heat pump, or boiler) matched to that load rather than rounding up to the next standard size, which is the single biggest driver of oversized, short-cycling systems.

  4. 4

    Manual D duct design

    We design the duct system (trunk and branch sizing, static pressure budget, and return-air paths) so the selected equipment can actually deliver its rated airflow to every room, not just the rooms closest to the air handler.

  5. 5

    Rough-in coordination

    Ductwork, refrigerant line sets, and venting go in during the framing stage, coordinated with the builder's schedule and with the electrician and plumber for disconnects, condensate lines, and gas piping.

  6. 6

    Trim-out

    Registers, grilles, thermostats, and indoor/outdoor equipment are installed after drywall and finishes, alongside the builder's trim schedule.

  7. 7

    Code compliance verification

    We confirm duct sealing, combustion air, and mechanical ventilation meet the state's adopted residential energy code, and coordinate with any blower-door or duct-leakage testing required for the project.

  8. 8

    Commissioning

    Before handoff, we start up the system, verify refrigerant charge or combustion settings, balance airflow room to room, and walk the homeowner through thermostat operation and maintenance basics.

Read the full Manual J guide

Want the detail behind southern NH's design temperature, envelope assumptions, and how load calculations actually get built?

Read: Manual J Sizing in Southern NH

Frequently asked

Building a new home?

Bring us in early: plan review is free and it's the cheapest stage to get mechanical design right.